ASSEMBLY / PRE-OPERATION
INSTALLDISCHARGECHUTE/CHUTEROTATERHEAD
CHECK TIRE PRESSURE
(See Fig. 7)
NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head.
The tires on your snow thrower were overinflated at the fac-
tory for shipping purposes. Correct and equal tire pressure
is important for best snow throwing performance.
1
. Place discharge chute assembly on top of chute base
with discharge opening toward front of snow thrower.
•
Reduce tire pressure to 14-17 PSI.
2.
Position chute rotater head over chute bracket. If nec-
essary, rotate chute assembly to align square and pin
on underside of chute rotater head with holes in chute
bracket.
3.
4.
With chute rotater head and chute bracket aligned,
position chute rotater head on pin and threaded stud
of mounting bracket.
Install 3/8 washer and locknut on threaded stud and
tighten securely.
CHUTE
ROTATER
HEAD
3/8
LOCKNUT
3/8
WASHER
CHUTE
BRACKET
PIN
THREADED
STUD
ROTATER HEAD
MOUNTING
BRACKET
FIG. 7
7
Categories | Poulan Pro Snow Blower Manuals, Snow Blower Manuals |
---|---|
Tags | Poulan Pro PP5524ESB |
Model Year | 2004 |
Download File |
|
Language | English |
Product Brand | Poulan Pro. Poulan Pro US phone support. Wheeled (Mowers, Tractors, Tillers, Snow Throwers): 1-800-849-1297, Handheld (Chainsaws, Trimmers, Blowers, Edgers): 1-800-554-6723, Snow Blower |
Document File Type | |
Publisher | poulanpro.com |
Wikipedia's Page | Poulan |
Copyright | Attribution Non-commercial |
(0 votes, average: 0 out of 5)