ASSEMBLY / PRE-OPERATION
INSTALLDISCHARGECHUTE/CHUTEROTATERHEAD
CHECK TIRE PRESSURE
(See Fig. 7)
NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head.
The tires on your snow thrower were overinflated at the fac-
tory for shipping purposes. Correct and equal tire pressure
is important for best snow throwing performance.
1
. Place discharge chute assembly on top of chute base
with discharge opening toward front of snow thrower.
•
Reduce tire pressure to 14–17 PSI.
2.
3.
4.
Positionchuterotaterheadoverchutebracket. Ifneces-
sary,rotatechuteassemblytoalignsquareandpinonun-
dersideofchuterotaterheadwithholesinchutebracket.
With chute rotater head and chute bracket aligned,
position chute rotater head on pin and threaded stud
of mounting bracket.
Install 3/8 washer and locknut on threaded stud and
tighten securely.
CHUTE
ROTATER
HEAD
3/8
LOCKNUT
3/8
WASHER
CHUTE
BRACKET
PIN
THREADED
STUD
ROTATER HEAD
MOUNTING
BRACKET
FIG. 7
7
Categories | Poulan Pro Snow Blower Manuals, Snow Blower Manuals |
---|---|
Tags | Poulan Pro PP8527ESB |
Model Year | 2004 |
Download File |
|
Language | English |
Product Brand | Poulan Pro. Poulan Pro US phone support. Wheeled (Mowers, Tractors, Tillers, Snow Throwers): 1-800-849-1297, Handheld (Chainsaws, Trimmers, Blowers, Edgers): 1-800-554-6723, Snow Blower |
Document File Type | |
Publisher | poulanpro.com |
Wikipedia's Page | Poulan |
Copyright | Attribution Non-commercial |
(0 votes, average: 0 out of 5)