Toro 220 Series Brass Valvessta Instructions Built On Proven Technologies Sprinkler Irrigation Owners Manual

Installation Guidelines
Note the flow direction arrow in the side of the valve body and install  accordingly.
The valve can be installed at any angle without affecting  operation.
Use direct-burial wire, utilizing  different color codes for each station control wire and one color for the common  wire to all
valves.
Waterproof wire splice connectors  are absolutely essential for proper electric control  system operation. Follow the
installation instructions  provided with the connectors for optimum waterproof  splice protection.
Leaving a wire expansion loop at each valve  location on long-run wire lengths is recommended.
Valve Operation and Adjustment
Flow Control
The flow control is used to reduce the flow and pressure  to valve outlet. By turning the control handle clockwise, the flow  will
gradually be reduced zero.
For valve models without EZReg,  adjust the flow control as necessary for optimum sprinkler  performance.
For valve models with EZReg, the flow control  should remain in the fully open position. Use only for emergency  shut off.
Manual Bleed Knob
The manual bleed knob is used to manually operate  the valve. Turning the knob counterclockwise 23 turns  allows water to
bleed downstream from the diaphragm  chamber, relieving pressure from the top of the diaphragm  which allows the valve to
open. Turning the bleed knob clockwise until finger  tight, shuts off the discharge enabling pressure to build within  the
diaphragm chamber, causing the valve  to close.
EZReg (pressure regulated  models only)
An accurate, adjustable dial coupled  with a forward-flow valve design allows the 220 series  valve with EZReg to regulate
downstream water pressure  with precision. It can regulate accurately down to 5 GPM flow (1" model)  and only requires 10 PSI
differential pressure to operate. The  EZReg will operate during powered and manual valve  operation.
To adjust, remove the cover from the regulator  dial. Turn the dial until the pointer is on the desired downstream pressure:
530 PSI (EZR-30) or 5100 PSI (EZR-100).
Note: Due to the micro-adjustment  feature of the EZReg, the dial requires several complete  revolutions to move the pointer
from the minimum to the maximum adjustment  settings.
Operate the valve (electrically  or manually). Check the flow control to confirm that it is in the fully open position. Adjust the
regulator dial if necessary for optimum  sprinkler operation.
To confirm the downstream pressure  using a pressure gauge, remove the cap from the Schrader-type  valve located directly
below the EZReg. Attach a Toro pressure gauge (Model 995-51)  to the Schrader-type valve for a direct reading. Adjust EZReg
dial as necessary for the desired pressure.
Note: The valve will remain operational  if removal of the EZReg assembly is required.
©
1999 The Toro Company, Irrigation Division
Form Number 373-0027 Rev A
Product Specification
CategoriesSprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals
Tags
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 2 pages
LanguageEnglish
Product BrandToro. Customer Service Representatives are available by phone: Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939
Document File TypePDF
Publishertoro.com
Wikipedia's PageToro Company
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website