3
.
Finish securing chute control assembly to chute support
bracket with wing nut and hex screw removed earlier.
See See Fig. 3-4.
Set-Up
Shear Pins
A pair of replacement auger shear pins and bow tie cotter pins
are included with your snow thrower. Store them in your snow
thrower’s dash panel until needed. See Fig. 3-6.
Figure 3-4
4
.
Check that all cables are properly routed through the cable
guide on top of the engine. See Fig. 3-5.
Figure 3-6
Chute Clean-Out Tool
The chute clean-out tool is fastened to the top of the auger
housing with a mounting clip and a cable tie at the factory. Cut
the cable tie before operating the snow thrower. See Fig. 3-7.
Chute Clean-out Tool
Figure 3-5
Figure 3-7
sectiOn 3 — asseMbly & set-up
7
Categories | Cub Cadet Snow Blower Manuals, MTD Snow Blower Manuals, Snow Blower Manuals |
---|---|
Tags | Cub Cadet 526 WE, MTD 526, MTD Snow Blower Manual |
Download File |
|
Document Type | Owner's Manual |
Language | English |
Product Brand | MTD, Snow Blower |
Document File Type | |
Publisher | mtdproducts.com |
Wikipedia's Page | MTD Products |
Copyright | Attribution Non-commercial |
(0 votes, average: 0 out of 5)