ASSEMBLY
TO ASSEMBLE
rod bracket while inserting the worm into
the notches in the discharge chute rota-
tion ring.
Place wave washer and flat washer onto
worm end of chute control rod.
Place cotter pin through worm end of
chute control rod.
THE CHUTE CONTROL ROD
Cut tie holding chute control rod to brack-
et.
1.
2.
3.
5.
6.
Remove plastic bag from chute control
rod.
Remove cotter pin, flat washer and wave
washer from the worm end of chute con-
trol rod and set aside (see Figure 2).
7.
8.
Bend cotter pin to secure.
Rotate the chute control rod fully clock-
wise and counterclockwise. The dis-
charge chute should rotate freely without
binding.
4.
Insert the worm end of the chute control
rod through the hole in the chute control
Worm End Chute
Control Rod
Chute Deflector
Wave Washer
Flat Washer
Cotter Pin
Discharge Chute
Notches
Chute Control
Rod Bracket
Figure 2
F-041020C
8
Categories | Murray Snow Blower Manuals, Snow Blower Manuals |
---|---|
Tags | Murray 620000X30N |
Download File |
|
Document File Type | |
Copyright | Attribution Non-commercial |
(0 votes, average: 0 out of 5)