English / USA
Mounting the Bar and Chain
5
1
4
3
:
Unscrew nut and take off cover.
:
:
Fit guide bar over the stud (3).
Engage peg of tensioner slide in
locating hole (4) – place the chain
over sprocket (5) at the same time.
Now turn tensioning screw (1)
clockwise until there is very little
chain sag on the underside of the
bar – and the drive link tangs are
located in the bar groove.
1
2
:
:
Refit the sprocket cover and screw
on the nut only fingertight.
The chain is very sharp – wear work
gloves to protect hands from cuts.
Now refer to "Tensioning the Saw
Chain".
:
Fit the chain –
start at the bar nose.
:
Turn tensioning screw (1)
counterclockwise until the
tensioning nut (2) butts against the
left end of the housing slot, then
back it off 5 full turns.
18
HT 250
Categories | Stihl Tiller Cultivator Manuals, Tiller Cultivator Manuals |
---|---|
Tags | STIHL HT 250 |
Download File |
|
Language | English, Español |
Product Brand | STIHL. Stihl Inc, USA - Corporate phone: (757) 486-9100. International Support Information: http://stihl.com Email: info@stihl.com, Tiller Cultivator |
Document File Type | |
Publisher | stihl.com |
Wikipedia's Page | Stihl |
Copyright | Attribution Non-commercial |
(0 votes, average: 0 out of 5)