determines the available start days. For example, if you
have selected a 3-day Interval and today is Sunday, you
may choose to start the Interval today, Monday or Tues-
day.
Wa te rin g Pro gra m De ta ils
This section covers in detail each of the three parts of a
watering program: watering days, program start times
and valve run times.
This illustration shows how
PGM
A B C
an Interval schedule would
be displayed. In this exam-
ple, program B has a 3-day
Interval schedule which will
start on Monday.
S e le c t in g Wa t e rin g Da ys
The ECx provides four options for scheduling watering
days: Calendar, Interval Odd/Even and Off.
1 2 3 4 5 6 7 8
SU
MO TU WE TH FR SA
Calendar Schedule
Odd/Even Schedule
A Calendar schedule enables you to select specific days
of the week to water, for example, Monday, Wednesday
and Friday. This is a seven-day schedule which starts on
Sunday and ends on Saturday.
The Odd/Even schedule enables you to select odd or
even numbered days of the month as watering days.
This illustration shows how
an Odd day schedule would
be displayed.
PGM
A
This illustration shows how
PGM
A
a Calendar schedule would
be displayed when the con-
trol dial is in the S ET WAT ER-
IN G DAYS position.
Program Off
SU
MO TU WE TH FR SA
Selecting Off suspends the operation of the program
when it is not needed. Turning the program Off does not
alter or erase the watering schedule information of the
program, it simply places the program on hold until it is
needed.
In this example, program A has watering days set for MO
(Monday), WE (Wednesday) and FR (Friday).
Interval Schedule
An Interval schedule enables you to set watering days
without regard to the actual days of the week. For exam-
ple, if you want to water every third day, you would
select a 3-day Interval. Interval schedules range from
This illustration shows how a
program would be displayed
if its watering day schedule
is turned Off. In this exam-
ple, program C is Off.
1-day
(watering every day) to 7-day (watering every sev-
enth day). Once you have selected an Interval schedule,
you can choose which day of the week will be the first
day of the Interval. The number of days in the Interval
8
Categories | Sprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals |
---|---|
Download File |
|
Language | English |
Product Brand | Toro. Customer Service Representatives are available by phone:
Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939 |
Document File Type | |
Publisher | toro.com |
Wikipedia's Page | Toro Company |
Copyright | Attribution Non-commercial |
(3 votes, average: 3 out of 4) Lawn and Garden readers have rated Toro Users Guide Automatic Outdoor Sprinkler Timer ECx Owners Manual 3.0 out of 4.0 based on 3 product reviews.
Its really hard to submit a review when I can see the manual. I don't know how to place specific sprinkler stations and specific timer programs.
so far, neutral. need to get the thing working again....
I desperately need a sprinkler operating manual.serial # 53768 purchased a Home, with sprinkler already installed...no one knows how to set it... please help.
mail one ? Brigitte Prescher
3858 N 210th street
Elkhorn, Nebraska
68022
thanx