english
Mounting the Bar and Chain
5
1
4
3
:
Unscrew nut and take off cover.
:
:
Fit guide bar over the stud (3).
Engage peg of tensioner slide in
locating hole (4) – place the chain
over sprocket (5) at the same time.
Now turn tensioning screw (1)
clockwise until there is very little
chain sag on the underside of the
bar – and the drive link tangs are
located in the bar groove.
1
2
:
:
Refit the sprocket cover and screw
The chain is very sharp – wear work
gloves to protect hands from cuts.
on the nut only fingertight.
Now refer to "Tensioning the Saw
Chain".
Turn tensioning screw (1)
counterclockwise until the
tensioning nut (2) butts against the
left end of the housing slot, then
back it off 5 full turns.
:
Fit the chain –
:
start at the bar nose.
16
HT 70, HT 75
Categories | Stihl Tiller Cultivator Manuals, Tiller Cultivator Manuals |
---|---|
Tags | STIHL HT 70, STIHL HT 75 |
Download File |
|
Language | English, Español |
Product Brand | STIHL. Stihl Inc, USA - Corporate phone: (757) 486-9100. International Support Information: http://stihl.com Email: info@stihl.com, Chainsaw |
Document File Type | |
Publisher | stihl.com |
Wikipedia's Page | Stihl |
Copyright | Attribution Non-commercial |
(0 votes, average: 0 out of 5)