Toro Automatic Sprinkler System Control Timer Irrigation Owners Manual

For example, if you have selected a 3-day Interval and
today is Sunday, you may choose to start the Interval
today, Monday or Tuesday.
Watering Program Details
This section covers in detail each of the three parts of a
watering program – watering days, program start times
and zone run times.
This illustration shows how an Inter-
val schedule would be displayed. In
this example, program B has a
Selecting Watering Days
3-day
Interval schedule which will
The ECXTRA provides four options for scheduling water-
ing days: Calendar, Interval, Odd or Even and Off.
start on Monday.
Odd/Even Schedule
Calendar Schedule
The Odd/Even schedule enables you to select odd or
even numbered days of the month as watering days.
A Calendar schedule enables you to select specific days
of the week to water, for example, Monday, Wednesday
and Friday. This is a seven-day schedule which starts on
Sunday and ends on Saturday.
This illustration shows how an
Odd day schedule would be
displayed.
This illustration shows how a Calendar schedule would
be displayed when the control dial is in the
Day Exclusion
position.
This feature enables you to prevent watering on specific
days of the week when using an Interval or an Odd/Even
watering day schedule.
WATERING  DAYS
In this example, program A has
watering days set for MO (Monday),
WE (Wednesday) and FR (Friday).
In this example, Monday and Fri-
day are excluded from program A.
Interval Schedule
An Interval schedule enables you to set watering days
without regard to the actual days of the week. For exam-
ple, if you want to water every third day, you would
select a 3-day Interval. Interval schedules range from
Program Off
Selecting OFF suspends the operation of the program
when it is not needed. Turning the program off does not
alter or erase the watering day schedule of the program,
it simply places the program on hold until it is needed.
1-day
(watering every day) to 7-day (watering every sev-
enth day). Once you have selected an Interval schedule,
you can choose which day of the week will be the first day
of the Interval. The number of days in the Interval deter-
mines the available start days.
This illustration shows how a pro-
gram would be displayed if its water-
ing day schedule is turned off. In this
example, program C is off.
16
Product Specification
CategoriesSprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 44 pages
LanguageEnglish
Product BrandToro. Customer Service Representatives are available by phone: Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939
Document File TypePDF
Publishertoro.com
Wikipedia's PageToro Company
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website