Hold Relay
The hold relay used on the Workman Spray System is
located in the spray control enclosure.
86
85
87A
87
87
Testing
87A
86
85
1.
Remove spray control enclosure faceplate, locate
hold relay and unplug wire harness connector from
relay.
30
30
2.
Connect multimeter (ohms setting) leads to relay ter-
minals 30 and 87 (Fig. 10). Ground terminal 86 and ap-
ply +12 VDC to terminal 85. The relay should make and
break continuity between terminals 30 and 87 as +12
VDC is applied and removed from terminal 85.
TOP VIEW
3.
Disconnect voltage from terminal 85 and multimeter
lead from terminal 87.
4.
Connect multimeter (ohms setting) leads to relay ter-
minals 30 and 87A. Apply +12 VDC to terminal 85. The
relay should make and break continuity between termi-
nals 30 and 87A as +12 VDC is applied and removed
from terminal 85.
Figure 10
5.
Disconnect voltage and multimeter leads from the
relay terminals. Reconnect relay to machine wire har-
ness.
Electrical System
Workman 200 Spray System
Page 2 – 8
Categories | Lawn Mower Manual, Sprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals |
---|---|
Tags | Toro 200 |
Download File |
|
Document Type | Service Manual |
Language | English |
Product Brand | Toro. Customer Service Representatives are available by phone:
Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939, Lawn Mower |
Document File Type | |
Publisher | toro.com |
Wikipedia's Page | Toro Company |
Copyright | Attribution Non-commercial |
(0 votes, average: 0 out of 5)