English / USA
5
7
6
3 2
7
4
:
:
:
Ease the cap (5) out of the starter
:
:
:
Thread the rope through the rotor
and secure it with a simple
overhand knot.
Coat rope rotor bearing bore with
non-resinous oil – see "Special
Accessories".
Slip rotor over starter post – turn it
back and forth to engage anchor
loop of rewind spring.
Refit the pawl (4).
Fit the washer (3).
Tensioning the Rewind Spring
grip.
:
Make a loop in the unwound
starter rope and use it to turn
the rope rotor six full revolutions
counterclockwise.
Remove remaining rope from the
rotor and grip.
Tie a simple overhand knot in the
new rope – see “Specifications” –
and then thread it through the top of
the grip and the rope bush (6).
:
:
Hold the rotor steady – pull out and
straighten the twisted rope.
Release the rope rotor.
:
Refit the cap in the grip.
:
:
:
Install spring clip (2) on starter post
and engage it on the pawl's peg –
the spring clip must point clockwise.
24
BT 120 C
Categories | Auger Drill Manuals, Stihl Auger Drill Manuals |
---|---|
Tags | STIHL BT 120 C |
Download File |
|
Document Type | Operator's Manual |
Language | English, Español |
Product Brand | STIHL. Stihl Inc, USA - Corporate phone: (757) 486-9100. International Support Information: http://stihl.com Email: info@stihl.com, Auger |
Document File Type | |
Publisher | stihl.com |
Wikipedia's Page | Stihl |
Copyright | Attribution Non-commercial |
(0 votes, average: 0 out of 5)