Toro 05144SL Rev A Line Painter 1200 Service Manual

7.
On the underside of the machine frame (Fig. 7):
8.  Install fuel tank to machine (see Fuel  Tank Installa-
tion in this section).
A.  Loosen flange nuts that retain two (2) belt guides
to  frame. Position  belt  guides  away  from engine
pulley.
9.  If machine is equipped with a hour meter, install hour
meter pickup wire to spark plug lead on engine.
B.  Loosen idler tension on pump  drive belt (lower)
and transmission drive bolt (upper) and remove belts
from engine pulley.
10.Connect stop switch wire to engine. Secure ground
wire to fuel tank bracket (item 14) with screw.
11.
Check and adjust  engine oil level  as needed (See
C. Remove  four (4)  screws that  secure engine  to
machine.
Checking Engine Oil Level).
12.Attach
high tension lead to the spark plug.
sure that fuel hose is secured to carburetor in-
8.
9.
Lift the engine from the frame.
13.Make
If necessary, remove cap screw that secures pulley
let. Open fuel shut–off valve.
to engine crankshaft. Slide pulley from crankshaft.
Installation (Fig. 5)
1.
Position machine on a level surface.
1
2.
Make sure  that all parts  removed from the  engine
during maintenance or rebuilding are properly installed
to the engine.
3.
If pulley was removed from engine, apply  antisieze
lubricant to engine crankshaft. Slide pulley onto crank-
shaft making  sure to  align pulley  key with crankshaft
slot.
2
4.
Apply Loctite #242 (or equivalent) to threads of cap
screw (item 19).  Secure pulley to  crankshaft with cap
screw. Torque cap screw  from 50 to 60 ft–lb (68  to 81
N–m).
Figure 6
1.
Fuel shut off valve
2.
Stop switch wire
5.
Position engine on the frame.
6.
cure  engine  to  frame  with  four  (4)  screws.  Torque
screws from 250 to 450 in–lb (28 to 51 N–m).
Align holes in frame with engine mounting holes. Se-
4
2
7.
On the underside of the machine frame (Fig. 7):
1
A.  Install transmission drive belt (upper) and pump
drive belt (lower) onto engine pulley. Make sure that
belts are correctly routed at idler pulleys.
1
2
3
B.  Position two (2) belt guides to allow from .060” to
.130”
(1.5 to  3.3 mm) clearance  when the traction
(upper) belt  is tensioned by the  idler pulley. When
properly  positioned, tighten  flange nuts  to  secure
belt guides to frame.
Figure 7
1.
2.
Flange nut
Belt guide
3.
4.
Pump drive belt
Engine pulley
Line Painter 1200
Page 3 – 9
Gasoline Engine
Product Specification
CategoriesLawn Mower Manual, Sprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals
Tags
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 92 pages
Document TypeService Manual
LanguageEnglish
Product BrandToro. Customer Service Representatives are available by phone: Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939, Lawn Mower
Document File TypePDF
Publishertoro.com
Wikipedia's PageToro Company
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website