Toro 04134SL Rev B Hydroject 3010 Service Manual

4.
Attach and gently  tighten special fitting of Charging
Tool (TOR4001) to inlet on top of accumulator.
5.
Close outlet valve on right hand side of charging tool
to  prevent   loss  of  pressurized   Nitrogen   from  ac-
cumulator. Closeinlet valve onleft handside ofcharging
tool to prevent back flow through the tank tube.
6.
Rotate the jam nut (not the fitting) of the accumulator
valve two (2) turns counterclockwise as viewed from the
top. This opens the valve and pressurizes the tool and
gauge.
Service range of Nitrogen pre-charge pressure:
1800
body is warm.
to 2800  PSI. Allow  +200 PSI if  accumulator
Figure 16
7.
If pre-charge pressure is  WITHIN service range, go
to  step 8.  If  pre-charge  pressure is  ABOVE  service
range, accumulator has internal damage and should be
rebuilt or  replaced. If  pre-charge pressure is  BELOW
service range, go to step 10 under Adding Dry Nitrogen
to Accumulator.
8.
Tighten nut of accumulator valve  clockwise and de-
pressurize tool by  slowly opening outlet valve on  right
hand side of pressure gauge.
9.
Disconnect charging tool from accumulator. Reinstall
the yellow protective cap and valve protector bracket.
Adding Dry Nitrogen to Accumulator
10.
With charging tool connected to accumulator, attach
a charged tank of dry Nitrogen to high pressure tube on
charging tool. Tighten tank fitting by turning hose fitting
counterclockwise.
11.
The accumulator tool, attached to the accumulator,
has  a pressurized  manifold. Open  inlet  valve on  left
hand slide  of charging tool  to pressurize supply  tube.
While watching  pressure  gauge on  tool, slowly  open
supply tank valve. Pressure reading on gauge will start
to rise. Close  supply tank valve when gauge pressure
reaches 2500  PSI  Wait a  few minutes  to make  sure
system  pressure  has  equalized  then add  additional
Nitrogen if necessary for 2500 PSI pre-charge.
12.
Close accumulator valve by turning lower nut clock-
wise.
Figure 17
13.
Slowly open knob on right hand side of charging tool
de-pressurize   the  tool,  then  remove  tool  from   ac-
cumulator.  Reinstall yellow  protective  cap  and valve
protector bracket.
NOTE: After  completion, install  a tag on  accumulator
indentifying the charging pressure and charging date.
14.
Do Test No. 2: Water Pump Pressure and Flow.
Testing
Page 6 - 14  Rev. A
HydroJect 3010
Product Specification
CategoriesLawn Mower Manual, Sprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals
Tags
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 124 pages
Document TypeService Manual
LanguageEnglish
Product BrandToro. Customer Service Representatives are available by phone: Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939, Lawn Mower
Document File TypePDF
Publishertoro.com
Wikipedia's PageToro Company
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website