Toro 08164SL Service Manual Workman MDE Preface Publication Service

Fusible Links
The wiring harness for the Workman includes three (3)
fusible links for circuit protection (Fig. 36).
3
1
Two (2) fusible links attach to the same main contactor
post as the main fuse. One of these fusible links (FL2)
is used for the switched power circuit. The other fusible
link (FL1) protects the charger circuit.
The third fusible link (FL3) is attached to the controller
B+ terminal. This link provides protection for the charge
indicator/hour meter gauge.
2
5
4
Ifanyofthesefusiblelinksshouldfail,theaffectedcircuit
willnotfunction.SeeChapter6   -- ElectricalDiagramsfor
schematic and wire harness information.
Figure 36
1.
2.
3.
Main contactor
Main fuse contactor post
Switched contactor post
4.
5.
Fusible links FL1 & FL2
Fusible link FL3
Workman MDE
Electrical System
Page 3 -- 23
Product Specification
CategoriesLawn Mower Manual, Sprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 112 pages
Document TypeCatalog
LanguageEnglish
Product BrandToro. Customer Service Representatives are available by phone: Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939, Lawn Mower
Document File TypePDF
Publishertoro.com
Wikipedia's PageToro Company
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website