Toro 08161SL Service Manual Model 30412 Groundsmaster 4000 D Preface Publication

IMPORTANT: Support  yoke when removing  cross
and bearings to prevent yoke damage.
5.  Install retaining rings to yoke and deck mount to se-
cure bearings in place.
2.
Use a press to remove yoke from deck mount:
6.  Make sure that assembled joint yoke moves without
binding.  Slight binding  can usually  be  eliminated by
lightly rapping the yoke lugs with a soft faced hammer.
If binding continues, disassemble  joint yoke and deck
mount to identify and eliminate source of binding.
A.  Place a small socket against one bearing in the
deck mount and a large socket on the opposite side
of the mount.
B.  While supporting the  large socket,  apply pres-
sure on small socket to  partially push the opposite
bearing into the large socket.
Installation (Fig. 11)
1.  Position joint yoke with deck mount to cutting deck.
C. Remove assembly from press, grasp partially re-
moved bearing  and tap on yoke  to completely re-
move the bearing.
2.  Securedeckmounttodeckwitheight(8)capscrews,
lock washers and flat washers.
3.
Place spacer washer (chamfered ID side down) and
D. Repeat process for remaining bearing.
E.  Remove yoke from mount.
then thrust  washer onto  joint yoke  shaft. Insert yoke
shaft  up through  lift  arm bushings.  Place  additional
thrust washer and then hardened washer on yoke shaft
and secure with slotted hex nut. Torque nut from 150 to
3.
Use a press and the above process to remove bear-
180
ft--lb (203 to 244 N--m) while aligning hole in shaft
ings and cross from yoke.
Thoroughly clean and inspect all components.
Joint Yoke Assembly
with slot in nut. Install cotter pin.
4.
4.
assembly. Secure rod end of rear arm assembly to deck
mount with cap screw and lock nut.
Position spacers on both sides ofrod end of rear arm
1.
5)
Make sure that rubber plate (item 6) and plate (item
are positioned in bottom of deck mount.
5.
tion on machine.
Grease joint yoke and lift arm bushings after installa-
2.
Apply a coating of grease to bearing bores of yoke
6.
tingdecktoverifythathydraulichosesandfittingsdonot
contact anything.
Afterassemblyiscompleted,raiseandlowerthecut-
and deck  mount. Also, apply  grease to bearings  and
sealofbearingassembly.Makesurethatallbearingroll-
ers are properly seated in bearing cage.
3.
Use a press to install cross and bearings into yoke.
A.  Press one bearing partially into yoke.
IMPORTANT: Take  care  when  installing  cross
into bearing to avoid damaging bearing seal.
B.  Carefully insert cross into bearing and yoke.
C. Hold cross in alignment and press bearing inuntil
it hits the yoke.
D. Carefully  place second  bearing into yoke  bore
and onto cross shaft. Press bearing into yoke.
4.
Use a press and the  above process to install deck
mount to yoke.
Groundsmaster 4000--D
Page 7 -- 13
Chassis
Product Specification
CategoriesLawn Mower Manual, Sprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals
Tags,
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 298 pages
Document TypeCatalog
LanguageEnglish
Product BrandToro. Customer Service Representatives are available by phone: Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939, Lawn Mower
Document File TypePDF
Publishertoro.com
Wikipedia's PageToro Company
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website