Toro 03112SL Rev B Service Manual Multi Pro 1200 1250

Adjustments
Shift Cable Adjustment (Fig. 6)
1.
gage parking brake, and  remove key from the ignition
switch. Place the shift lever in the neutral position.
Park machine on  a level surface,  stop engine, en-
1
2
3
4
2.
Remove cotter pins and clevis pins that secure cable
clevis to shift levers.
3.
tered in the mounting brackets. If needed, readjust shift
cable jam nuts.
Check that the  threads of the shift cables  are cen-
4.
Adjust cable clevis with  clevis jam nuts so that for-
ward and backward free play of clevis is equal relative
to the hole in the transaxle shift lever. Tighten clevis jam
nuts.
2
3
5
1
5.
cotter pins.
Secure cable clevis to shift levers with clevis pins and
Figure 6
1.
2.
3.
Shift cable jam nut
Clevis pin
Clevis jam nut
4.
5.
Shift cable (1/reverse)
Shift cable (2/3)
6.
Check shift lever for proper operation.
Drive Train
Page 7 – 8
Multi Pro 1200/1250
Product Specification
CategoriesLawn Mower Manual, Sprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals
Tags,
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 268 pages
Document TypeService Manual
LanguageEnglish
Product BrandToro. Customer Service Representatives are available by phone: Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939, Lawn Mower
Document File TypePDF
Publishertoro.com
Wikipedia's PageToro Company
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website