Toro 09173SL Workman HD Series Service Manual

16.Put
axle with a floor jack or suspend transaxle from vehicle
frame rails.
blockingunderengineforsupport.Supporttrans-
1
1
17.Remove
isolation mount assemblies  and transaxle
mounts (Fig. 16).
18.Remove
driveshaft clamp bolts, then slide transaxle
side--to--side to  disconnect each  driveshaft from axle
shafts on transaxle.
19.Remove
engine. Note location of washers and harness brackets.
cap screws securing clutch bell housing to
2
2
20.Carefully
pull transaxle back to disengage transaxle
input shaft from clutch. Use floor jack to lower transaxle
and slide out rear of vehicle under the frame.
Figure 16
1.
Transaxle mount
2.
Driveshaft
21.Note
location and retrieve  two (2) dowel pins from
bell housing.
2
Transaxle Installation (Fig. 12)
3
1
1.
To install the transaxle, perform Transaxle Removal
procedure in reverse order noting the following:
IMPORTANT: Workman HD (air cooled, gasoline en-
gine)vehiclesrequireapplicationofsiliconesealant
to mating surface of bell housing and clutch adapter
plate on  engine. This  will prevent  dirt and debris
from getting into bell housing and damaging clutch
or release bearing.
3
4
A.  When installing  driveshafts to  transaxle,  apply
antiseize lubricant to transaxle shafts. Align mount-
ing holes in driveshaft with relief  in transaxle shaft.
Install cap  screws,  hardened washers  and flange
nuts to secure driveshaft to transaxle shaft. Torque
fasteners from 40 to 45 ft--lb (55 to 61 N--m).
Figure 17
3.
4.
1.
2.
Bell housing
Cap screw (6 used)
Harness bracket
Dowel pin (2 used)
230
(26 to 27 N--m)
to 240 in--lb
B.  Before installing two (2) shift levers and shift arm
onto  transaxle shafts,  thoroughly  clean  tapers of
shafts, shift levers and shift arm. Apply Loctite #680
to threads and tapers  of shafts. Secure levers and
shift arm by torquing nut from 230 to 240 in--lb (26 to
230 to 240 in--lb
(26
to 27 N--m)
27
fer into transaxle (Fig. 18).
N--m) while holding lever to prevent torque trans-
Apply Loctite #680
to threads and tapers
2.
the Dexron III oil (see Operator’s Manual). Check for oil
leaks and repair as necessary.
Install a new hydraulic oil filter and fill transaxle with
3.
differential lock cable (see Operator’s Manual).
Adjust clutch pedal, shift cables, high--low cable and
4.
Cable Adjustment  in  the Adjustments  section of  this
chapter).
If equipped with PTO,  adjust PTO cable (see PTO
Figure 18
Drive Train
Page 6 -- 18
Workman HD Series
Product Specification
CategoriesLawn Mower Manual, Sprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals
Tags
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 306 pages
Document TypeService Manual
LanguageEnglish
Product BrandToro. Customer Service Representatives are available by phone: Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939, Lawn Mower
Document File TypePDF
Publishertoro.com
Wikipedia's PageToro Company
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website