5.
Drive Shaft Removal).
Disconnect PTO drive shaft from gearbox (see PTO
8. Connect PTO drive shaft to gearbox (see PTO Drive
Shaft Installation).
6.
ers (item 11) that secure gearbox assembly to gearbox
brackets.
Remove four (4) cap screws (item 10) and lock wash-
9. Install drive belt and deck covers to cutting deck.
10.Torque
plug in gearbox to 175 in–lb (19.8 N–m). Fill
gearbox with lubricant.
7.
bracket (item 3) to deck mounting plate. Remove brack-
et from deck.
Remove fasteners that secure left side gearbox
11.
Lower the footrest.
8.
tached, from deck. Drain lubricant from gearbox.
Remove gearbox assembly, with drive pulley at-
2
9.
bushing to drive pulley on gearbox shaft.
Remove two (2) set screws that secure taper lock
1
1
10.Thread
one of the removed set screws into threaded
hole of bushing (Fig. 16). Tighten set screw to loosen
bushing from pulley hub.
11.
and retrieve woodruff key.
Slide bushing and pulley from gearbox shaft. Locate
Figure 16
1.
2.
Set screw installation position
Set screw removal position
12.If
necessary, remove and replace oil seals and oil
caps in gearbox (Fig. 17).
175
(19.8
in–lb
N–m)
NOTE: If internal gearbox wear or damage occurs,
gearbox replacement is necessary. Internal gearbox
components are not available.
175
(19.8
in–lb
N–m)
6
Installation (Fig. 15)
2
1
1.
Clean gearbox output shaft, pulley ID and taper lock
bushing thoroughly.
2.
Position woodruff key, pulley and then taper lock
6
bushing to gearbox output shaft. Slide bushing to shoul-
der on shaft. Align threaded holes of pulley with non–
threaded holes of bushing.
3.
Lightly oil threads of set screws and install screws
3
into threads of pulley (Fig. 16). Alternately and evenly
tighten set screws to a torque from 180 to 250 in–lb (20
to 28 N–m).
4
4.
with grease to prevent dirt from packing into crevices.
Fill allen recess in set screws and bushing threads
5.
Position gearbox assembly, with drive pulley at-
5
tached, to deck.
Figure 17
6.
12)
Position and secure left side gearbox bracket (item
to deck mounting plate.
1.
2.
3.
Oil cap
Dipstick
Oil cap
4.
5.
6.
Gearbox
Oil seal
Plug
7.
Secure gearbox assembly to gearbox brackets with
four (4) cap screws (item 10) and lock washers (item 11).
Groundsmaster 7200/7210
Page 7 – 15
Cutting Deck
Categories | Lawn Mower Manual, Sprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals |
---|---|
Tags | Toro Groundsmaster 7200, Toro Groundsmaster 7210 |
Download File |
|
Document Type | Service Manual |
Language | English |
Product Brand | Toro. Customer Service Representatives are available by phone:
Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939, Lawn Mower |
Document File Type | |
Publisher | toro.com |
Wikipedia's Page | Toro Company |
Copyright | Attribution Non-commercial |
(0 votes, average: 0 out of 5)
My mower is a TORO 7210.
Start fuse defection. Why ?