Toro 00062SL Rev I Greensmaster 3250 D Service Manual

A.  Position  mounting  plate  and  tanks  onto  the
frame.
14. Connect hydraulic oil cooler if installed (Fig. 21).
A.  Connect tube and O−ring to hydraulic fitting on
the hydraulic reservoir.
B.  Connect fuel hose coming from the fuel filter/wa-
ter separator at the injector pump inlet (Fig. 24).
B.  Connect tube and O−ring to hydraulic fitting on
the oil filter.
C. Connect fuel hose to the injector pump that goes
to the fuel tank (Fig. 24). Secure hoses to frame with
clamps (19 and 20) (Fig. 18).
15.
Connect hoses to radiator (4) as follows (Fig. 17):
A.  Connect radiator hose (2) to the water pump.
D. Connect  double hose  clamp (12)  to fuel  hose
(48)
tank (Fig. 19). Connect fuel hose (21) going to the
fuel filter/water separator at the fuel shut−off fitting
and rear engine mount (11) near the over flow
B.  Make sure drain petcock (32) on the back of the
radiator is shut.
(9)
(Fig. 18).
C. Connect expansion tank hose (25) and radiator
hose (17) to the thermostat housing (27).
E.  If the oil cooler is not installed, Connect hydrau-
lic hose to the hydraulic oil filter (Fig. 23).
16.
Connect remaining  hydraulic reservoir  as follows
(Fig 20):
F.  Connect hydraulic hose to power steering at the
hydraulic reservoir (Fig. 22).
A.  Remove plug from pump inlet hose.
G. Make sure hoses are secured to the frame and
supports with cable ties and hose clamps.
B.  Secure pump inlet hose to  the gear pump with
hose clamp.
H. Secure  tank mounting plate (13) to the support
bracket (17)  and frame with  three cap screws (6)
and two flat washers (14) (Fig. 18).
C. Remove  clamp from pump  inlet hose that was
used to  prevent hydraulic tank  from inadvertently
draining.
12.
Install muffler as follows (Fig. 12):
17.
Make sure  all fuel  hoses are  connected properly
(see Fuel Tank Installation).
A.  Position muffler to  machine with muffler shield
(8)
attached.
18.
Install console shroud to the control panel.
B.  Secure muffler (7)  to the pump  plate (30) with
two cap screws (4).
19.
with fuel (see Fill Fuel Tank). Check tank and hoses for
leaks.
Make sure fuel shutoff  valve is open. Fill fuel tank
C. Secure  exhaust plate (11) to the exhaust  man-
ifold with four metric hex nuts (28).
20.
Fill cooling system with coolant (see Check Cooling
System). Check radiator and hoses for leaks.
13.
Install air cleaner as follows (Fig. 12):
21.
22.
Hydraulic System Fluid  in Chapter 5 − Hydraulic  Sys-
tem). Check reservoir and hoses for leaks.
Adjust alternator belt (see Adjust Alternator Belt).
Fill hydraulic reservoir with hydraulic oil (see Check
A.  Install air cleaner and mounting bracket (5) to the
air cleaner bracket (2). Secure mounting bracket to
the air cleaner bracket.
B.  Connect air cleaner hose (17) to the engine air
intake manifold.
23.
24.
Bleed fuel system (see Bleed Fuel System).
Adjust throttle control  lever and cable (see  Adjust
Throttle Control).
Engine
Greensmaster 3250−D
Page 3 − 22
Product Specification
CategoriesLawn Mower Manual, Sprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals
Tags
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 308 pages
Document TypeService Manual
LanguageEnglish
Product BrandToro. Customer Service Representatives are available by phone: Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939, Lawn Mower
Document File TypePDF
Publishertoro.com
Wikipedia's PageToro Company
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website