7.
Torque nut from 90 to 100 ft--lb (123 to 135 N--m) while
Installballjointmounttoballjointwithslottedhexnut.
CAUTION
aligning cotter pin holes. Install cotter pin.
8.
Installation in Chapter 8 -- Cutting Decks).
Install front cutting deck (see Front Cutting Deck
When changing attachments, tires or perform-
ing other service, use correct jacks and sup-
ports. Make sure machine is parked on a solid,
level surface such as a concrete floor. Prior to
raising machine, remove any attachments that
may interfere with the safe and proper raising of
themachine.Alwayschockorblockwheels.Use
jack stands to support the raised machine. If the
machine is not properly supported by jack
stands, the machine may move or fall, which
may result in personal injury.
9.
jam nut from 150 to 175 ft--lb (203 to 237 N--m).
Ifballjointwasremoved fromliftarm,torqueballjoint
10.Lubricate
lift arm grease fittings.
11.
tingdecktoverifythathydraulichosesandfittingsdonot
contact anything.
Afterassemblyiscompleted,raiseandlowerthecut-
12.Check
height--of--cut and deck pitch adjustment.
3.
Chock rear wheels and jack up front of machine.
Support machine on jack stands.
4.
moved.
Remove front wheel next to lift arm that is to be re-
1
5.
cure liftcylinder pin to liftarm. Remove pin and separate
lift cylinder and lift arm.
Remove cap screw, washers and lock nut that se-
6.
Remove lock nut that secures lift arm pin. Support lift
2
arm and slide pin from frame and lift arm. Remove lift
arm from frame.
0.870”
(22.1
mm)
7.
ball joint from removed lift arm as required.
Remove height--of--cut chain, ball joint mount and
Installation (Fig. 2)
Figure 3
1.
U--bolt
2.
Height--of--cut chain
1.
Position lift arm to frame and insert lift arm pin. En-
gage roll pin into frame slots and install lock nut on pin.
Torque lock nut from 60 to 70 ft--lb (81 to 94 N--m).
2.
arm and cylinder end. Secure pin with cap screw, wash-
ers and lock nut.
Align lift cylinder with lift arm. Slide pin through lift
1
3.
the ground. Make sure that wheel lug nuts are torqued
Install front wheel assembly and lower machine to
from 85 to 100 ft--lb (115 to 135 N--m).
4.
secure plate fully forward in lift arm slot.
If sensing plate (item 32) was removed from lift arm,
2
5.
If height--of--cut chain u--bolt was removed from lift
arm, assemble u--bolt so that threaded portion extends
0.870”
3).
(22.1 mm) above mounting plate on lift arm (Fig.
2.210”
to 2.390”
(56.1
to 60.7 mm)
6.
If removed, install ball joint to lift arm. Distance from
endofliftarmtocenter ofballjointshouldbefrom2.210”
to 2.390” (56.1 to 60.7 mm) (Fig. 4). Make sure that ball
joint is horizontal and that stud is centered in ball joint.
Install deck before torquing ball joint jam nut (item 24).
Figure 4
1.
Lift arm
2.
Ball joint
Groundsmaster 4000--D/4010--D
Page 7 -- 5
Chassis
Categories | Lawn Mower Manual, Sprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals |
---|---|
Tags | Toro Groundsmaster 10176SL, Toro Groundsmaster 30446, Toro Groundsmaster 30448, Toro Groundsmaster 4010 D |
Download File |
|
Document Type | Catalog |
Language | English |
Product Brand | Toro. Customer Service Representatives are available by phone:
Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939, Lawn Mower |
Document File Type | |
Publisher | toro.com |
Wikipedia's Page | Toro Company |
Copyright | Attribution Non-commercial |
(0 votes, average: 0 out of 5)