Leveling Rear Roller
The precision machined components of the cutting unit
frame keep the rear roller and cutting reel in alignment
(parallel). If the side plates are disassembled or as the
cutting reel wears, a limited amount of side plate adjust-
ment is possible to make sure that the cutting unit is
properly aligned.
3
2
4
1
Cutting Unit with 7” Reel Shown
1.
2.
Place the assembled cutting unit on a surface plate.
Make sure that bedknife is properly adjusted to cut-
4
ting reel.
3.
Using the surface plate, check if rear roller is level to
cutting reel by using a 0.005” (0.13 mm) shim at each
end of rear roller. If the shim will pass under the roller at
one end but not the other, a frame adjustment should be
made.
Figure 12
1.
2.
Bedbar
3.
Spring tension lock nut
Shoulder bolt
Bedbar adjuster screw
4.
NOTE: Cutting units with 5” diameter reel use two (2)
shoulder bolts to secure endplates to frame. Cutting
units with 7” diameter reel use three (3) shoulder bolts
to secure endplates to frame.
4
1
4.
cure the side plate to the frame opposite the side that is
not level (Fig. 12).
Loosen, but do not remove, shoulder bolts that se-
5
5.
rear roller and cutting reel. Then, tighten the shoulder
Adjust the position of the side plate to parallel the
bolts to a torque from 27 to 33 ft--lb (37 to 44 N--m).
6.
If necessary, loosen and adjust second side plate.
Aftertighteningthesideplate,rechecktherearroller.
6
2
7.
If rear roller is still not level after adjusting both side
plates, check to see if cutting reel is tapered (see Pre-
paring Reel for Grinding in the Service and Repairs sec-
tionofthischapter). Ifcutting reelis nottapered andrear
roller isnotlevel, a0.010” shim(part number 107--4001)
is available to allow additional rear roller adjustment.
The shim would be used on one side of the rear roller
and should be installed between the rear roller bracket
and roller shim (Fig. 13).
3
Figure 13
1.
2.
3.
Rear roller assembly
Rear roller bracket
Carriage screw
4.
5.
6.
Flange nut
Roller shim
0.010” shim (if needed)
8.
Afterlevelingrearroller,completecuttingunitset--up
and adjustment sequence.
Reelmaster 5010 Series
Page 7 -- 13
Cutting Units
Categories | Lawn Mower Manual, Sprinkler and Irrigation Manuals, Toro Sprinkler and Irrigation Manuals |
---|---|
Tags | Toro 5210, Toro 5410, Toro 5510, Toro 5610 |
Download File |
|
Document Type | Catalog, Service Manual |
Language | English |
Product Brand | Toro. Customer Service Representatives are available by phone:
Monday - Friday 7:30 a.m. to 9:00 p.m. (CDT) - Saturday 8:00 a.m. to 8:00 p.m. (CDT) - Sunday 10:00 a.m. to 8:00 p.m. (CDT)
Canada 1-888-225-4886 USA 1-888-384-9939, Lawn Mower |
Document File Type | |
Publisher | toro.com |
Wikipedia's Page | Toro Company |
Copyright | Attribution Non-commercial |
(1 votes, average: 4 out of 4) Lawn and Garden readers have rated Toro 06148SL Rev B Reelmaster 5210 5410 5510 5610 Service Manual 4.0 out of 4.0 based on 1 product reviews.
i hope is going to work